5 of 14 Goals Achieved
36%
Planned

[P1] Use a Standard Permit Application Form Specific to PV Systems(18)

There is a standard building permit application form, but nothing specific to PV currently.

Consider adopting a standard application form specific to solar PV for qualifying projects under 10kW.

[P2] Make Permit Application Form Available Online(176)

Permit application is available in person, can be downloaded online, and sent via email or regular mail if requested.

[P3] Allow Electronic Submittal of Application Form(87)

Permit application form can be submitted online, via email, in person or through the mail.

[P4] Require only 1 Permit Application Submittal(164)

Single permit application submittal.

[P5] Post Permit and Inspection Process Information and Fee Schedules Online(80)

All permit, inspection, and fee schedules are available online.

[P6] Streamline Permit Processing Time and Allow Expedited Process for Qualifying Projects(75)

Permit applications are greater than ten days for residential and 15 days for commercial. BAR meets twice per month.

Consider an expedited or over-the-counter permit approval process for qualifying PV projects using a standard application form (see goal P1). For all projects, issue or deny permit within 3 business days of submittal for residential and within 5 business days for commercial.

[P7] Base Residential Permit Fee on Actual Cost to Administer(85)

Permit application fee for residential projects is a valuation based typically >$500

Base residential permit fees on cost recovery, or if a flat fee is used keep the fee amount under $250.

[P8] Base Commercial Permit Fee on Actual Cost to Administer(55)

Permit application fee for commercial projects is a valuation based typically >$500.

Base commercial permit fees on cost recovery, or if a flat fee is used keep the fee amount under $500.

[P9] Minimize Inspection Turnaround Time(147)

Inspection request turnaround time is 6 - 10 days for residential and >10 days for commercial

Perform inspection within 2 business days of request.

[P10] Offer Convenient Inspection Scheduling(94)

Inspection appointment window given to installer is 3-4 hours

Provide an appointment window of 2 hours or less if possible. Provide real time updates prior to arrival so contractor is aware and prepared.

[P11] Require only 1 Inspection Visit(82)

Single permit inspection visit with separate electrical inspection visit.

Require only a single permit inspection. If additional inspections are required during installation, conduct in a manner that does not require installer to halt work.

[P12] Adopt an Inspection Checklist(21)

No inspection checklist currently in use.

Utilize a standard inspection checklist for PV systems. The checklist serves as a guide for inspectors and installers containing points of emphasis and common issues.

[P13] Allow a Structural Exemption for Qualifying Systems(41)

Structural PE stamp is required for residential systems.

For qualifying residential systems meeting certain criteria, allow an exemption from structural analysis or structural PE stamp requirements.

[P14] Understand New Solar-Specific Building, Electrical, and Fire Codes(82)

Currently on 2008 NEC, NFPA-70 and Residential Code of New York State 2010.

showPlanning & Zoning

1 of 6 Goals In Progress
17%
Planned

[Z1] Pursue Protection for Solar Rights and Access(72)

No local ordinance to protect solar rights and access.

Create local ordinances which would protect property owners' right to install solar and ensure their property has unobstructed access to direct sunlight.

[Z2] Promote Solar Ready Construction via Ordinances or Building Codes(15)

Solar ready construction is not required for new construction.

Explore creation of municipal ordinances which require new homes and buildings to be built solar-ready.

[Z3] Require Solar on New Construction(4)

Solar is not a requirement for new construction.

Explore implementing solar mandates for new construction for all buildings or a segment of the new building stock

[Z4] Incorporate Solar Priorities into Comprehensive or Energy Action Plans(66)

Village Master Vision Plan is currently being developed. This Plan will will incorporate solar development.

Include solar development goals in long term planning documents.

[Z5] Update Zoning Standards and Review for Solar Installations(92)

Zoning code does not specifically address solar.

Ensure the zoning codes and ordinances that govern solar installations, such as setbacks, height limits and lot use provisions, do not restrict property owners' ability to install solar.

[Z7] Limit Impact of Restrictive Private Covenants(81)

TBD; Village has numerous homeowner associations.

Work with condo owner and homeowners associations to ensure that their covenant, conditions, and restrictions and bylaws do not create undue barriers to solar installations.

showFinancing Options

0 of 3 Goals Not Started
0%
Planned

[F5a] Explore Implementation of Local PACE Financing Pilot Program (73)

No local PACE financing program.

Establish a working group to evaluate the potential of a PACE financing program for clean energy upgrades in your jurisdiction based on national examples by local municipalities.

[F6] Encourage Local Financial Stakeholders to Establish New Solar Loan Programs(63)

No local solar loan program available.

Encourage local financial institutions to establish loan programs for solar energy systems.

[F7] Promote Availability of Existing Solar Finance Options and Evaluation Tools(38)

Limited awareness within the community currently.

Publicize the availability of local solar finance options and solar evaluation tools for potential buyers. This can be done via webinars, marketing materials, or by providing links and information online.

showSolar Market Development

2 of 6 Goals Achieved
33%
Planned

[M1] Support Aggregate Procurement Program for Residential Sector(40)

No aggregate solar procurement program for the residential sector.

Support the creation of a working group of community leaders and funding providers. This group would evaluate options and determine the most viable approach for aggregating residential solar based on best practices to date.

[M3] Explore Implementation of Collaborative Procurement Program for Municipal Facilities and Schools(38)

No collaborative procurement programs within the village.

Consider collaborating with agencies across the region to aggregate government facilities, including municipal buildings and schools, for solar evaluation and cost-effective procurement to demonstrate leadership and reduce energy costs while strengthening the economy and environment.

[M6] Explore Installing Solar at Municipal Facilities, Including Landfill and Water Treatment Facilities(62)

The village has solar installation on Fire Department.

Goal achieved, Ardsley has installed solar on the Fire Department.. Drawing on this initial experience, consider exploring solar feasibility at additional sites / larger sites such as landfills or water treatment plants. Per goal [M3] consider working with other local agencies on a collaborative procurement to reduce costs.

[M7] Publicize Solar Workforce Development Resources and Industry Training Tools(21)

Village is located within Town of Greenburgh and has adopted the Town Assessment Roll (2012) allowing the Village to participate in Town's energy programs, e.g. Energize PACE financing.

[M8] Provide Solar Educational Resources to Constituents(77)

Limited awareness within the community currently.

Help promote the availability of online tools and resources for the residential, commercial, and municipal solar markets through existing networks.

[M9] Publicize Innovative Solar Market Development Tools(0)

Limited awareness of these tools locally.

Help promote the availability of innovative market development tools for the residential, commercial, and municipal solar markets through existing networks.